STLCA STLCAThe accountability layer between complaint and policy.
3
Total records on file
2015-2016
0
Closed / Completed with
no inspection result recorded
0% of all closed cases
1
Records with
no inspection date in public record
33% of all records
0
Still open /
under investigation
1
Enforcement actions
(NOV / Order / Referral)
2
Records with a documented
inspection result
67% inspection rate
6
Days - longest single
case on record at this address
Record Types
BLANK/LLT 2
CONSTRUCTION 1
Complaint & Enforcement Timeline - 3 Records
2015-10-01 006412-15CP CONSTRUCTION
INSTALLED SIGN W/O PERMIT. THE SIGN HANGS IN FRONT OF THE NEW YORK NAILS AND WAXING BUSINESS ABOUT 8' ABOVE THE SIDEWALK. SEE ATTACHED EMAILS.
SDCI Notes: PERMIT NEVER OBTAINED FROM DPD FOR "NEW YORK NAILS & WAXING SIGN."10/7/15: 2 PHOTOS TAKEN BY SIGN INSPECTOR VICKI BAUCOM.
COMPLETED · Inspection: 2015-10-07 · Result: COMPLETED
2016-10-11 007006-16CP nan
BUILDING FOUNDATION IS CRACKING AND BUCKLING. THERE IS BROKEN WALL COVERING AND CEILING COVERING BECAUSE OF THE STRUCTURAL ISSUES.
SDCI Notes: VIOLATION OF THE HBMC STANDARDS08/26/16-VS-OBSERVED SEVERAL VIOLATIONS OF THE HBMC STANDARDS OF INCLUDING BUT NOT LIMITED TO STRUCTURAL COMPONENTS THATS DETERIORATING, BUCKLING AND CRACKING OF FOUNDATION, INTERIOR WALLS, CEILINGS AND FLOORS.
COMPLETED · Inspection: 2016-08-26 · Result: COMPLETED
2016-10-11 1038598-VI nan
BUILDING FOUNDATION IS CRACKING AND BUCKLING. THERE IS BROKEN WALL COVERING AND CEILING COVERING BECAUSE OF THE STRUCTURAL ISSUES.
SDCI Notes: VIOLATION OF THE HBMC STANDARDS08/26/16-VS-OBSERVED SEVERAL VIOLATIONS OF THE HBMC STANDARDS OF INCLUDING BUT NOT LIMITED TO STRUCTURAL COMPONENTS THATS DETERIORATING, BUCKLING AND CRACKING OF THE FOUNDATION, INTERIOR WALLS, CEILINGS AND FLOORS.
NOV ISSUED · Inspection: No inspection date · Result: No result recorded