THE TOPMOST STORY (4TH STORY IF INCLUDING THE BASEMENT) FOOTPRINT OF HOUSE BEING BUILT AT THIS LOCATION DOES NOT MATCH THE APPROVED PLANS. THE EAST-MOST WALL OF THE FOOTPRINT EXTENDS AT LEAST 10 FT FURTHER EAST THAN APPROVED. THIS SHOULD BE ADJUSTED TO MATCH THE APPROVED PLANS.
SDCI Notes: AT THE 8/13/20 INVESTIGATION, THE SDCI BUIDING INSPECTOR CONFIRMED THAT REVISED PLANS ARE UNDER REVIEW TO ADDRESS THE CHANGES TO THE LEVEL 2 EAST CANTILEVERED DECK DIMENSION. REVIEWS ARE BEING CONDUCTED UNDER 20DPD-021181.
COMPLETED
·
Inspection: 2020-08-13
·
Result: COMPLETED